HDS-14LSX / HDS-14LSXE Lifts 11 P/N 5900162 — April 2018 — Rev. F3
Installation Checklist
Following are the steps needed to install your Lift. Perform them in the order shown.
☐ 1. Review the installation safety rules.
☐ 2. Make sure you have the necessary tools.
☐ 3. Plan for electrical work.
☐ 4. Select the installation location.
☐ 5. Unload and unpack the Lift components.
☐ 6. Create Chalk Line Guides.
☐ 7. Move the Posts into position.
☐ 8. Install the Crosstubes.
☐ 9. Install the Ladders.
☐ 10. Raise the Crosstubes
☐ 11. Secure the Ladders.
☐ 12. Install the Runways.
☐ 13. Install the first end of the Flex Tube.
☐ 14. Install the Return Line.
☐ 15. Install the Air Lines.
☐ 16. Install the Hydraulic Line.
☐ 17. Route the Cables.
☐ 18. Install the Power Unit.
☐ 19. Install the second end of the Flex Tube.
☐ 20. Install the Pushbutton Air Valve and connect the Air Line.
☐ 21. Connect the Return Line.
☐ 22. Connect the Hydraulic Line.
☐ 23. Contact the Electrician.
☐ 24. Connect to a power source (electrician required).
☐ 25. Install the Power Disconnect Switch and the Thermal Disconnect Switch (electrician required).
☐ 26. Anchor the Posts.
☐ 27. Perform final leveling.
☐ 28. Install the Accessories
☐ 29. Lubricate the Lift.
☐ 30. Bleed the Hydraulic Cylinder.
☐ 31. Perform an operational test.
☐ 32. Review the final checklist.
☐ 33. Leave the manual for the owner/operator.