HDS-14LSX / HDS-14LSXE Lifts 11 P/N 5900162April 2018 Rev. F3
Installation Checklist
Following are the steps needed to install your Lift. Perform them in the order shown.
1. Review the installation safety rules.
2. Make sure you have the necessary tools.
3. Plan for electrical work.
4. Select the installation location.
5. Unload and unpack the Lift components.
6. Create Chalk Line Guides.
7. Move the Posts into position.
8. Install the Crosstubes.
9. Install the Ladders.
10. Raise the Crosstubes
11. Secure the Ladders.
12. Install the Runways.
13. Install the first end of the Flex Tube.
14. Install the Return Line.
15. Install the Air Lines.
16. Install the Hydraulic Line.
17. Route the Cables.
18. Install the Power Unit.
19. Install the second end of the Flex Tube.
20. Install the Pushbutton Air Valve and connect the Air Line.
21. Connect the Return Line.
22. Connect the Hydraulic Line.
23. Contact the Electrician.
24. Connect to a power source (electrician required).
25. Install the Power Disconnect Switch and the Thermal Disconnect Switch (electrician required).
26. Anchor the Posts.
27. Perform final leveling.
28. Install the Accessories
29. Lubricate the Lift.
30. Bleed the Hydraulic Cylinder.
31. Perform an operational test.
32. Review the final checklist.
33. Leave the manual for the owner/operator.