EasyManuals Logo

BendPak XPR-9 Series User Manual

BendPak XPR-9 Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
XPR-9 Series Two-Post Lifts 13 P/N 5900371 — Rev. D2 — May 2023
Installation Checklist
Following are the steps needed to install an XPR-9 Series Lift; perform them in this order.
1. Review the Safety Rules and information.
2. Plan for Electrical work.
3. Make sure you have the necessary Tools.
4. Review the Installation Orientation.
5. Review Clearances around and above the Lift.
6. Select the Installation Location.
7. Put Equalizing Cables into position in the Lift Posts.
8. Read about Hydraulic Contamination.
9. Read about Thread Sealant.
10. Put the Hydraulic Hoses into position in the Lift Posts.
11. Create Chalk Line Guides for the Posts.
12. Install the Equalizing Cables.
13. Install Cylinder Chain and Roller.
14. Anchoring the Posts and Install the Left and Right Foot Guards.
15. Install the Safety Assemblies and Safety Lock Cable.
16. Install and Connect the Hydraulic Hoses.
17. Mount the Power Unit (do not connect it to power yet).
18. Learn about Arm Restraint Gears.
19. Install the Lift Arms.
20. Contact the Electrician.
21. Connect the Power Unit (Electrician required).
22. Install the Power Disconnect Switch and Thermal Disconnect Switch (Electrician required).
23. Perform final Leveling.
24. Install the Safety Covers.
25. Lubricate the Lift.
26. Perform an Operational Test.
27. Review the final Checklist.
28. Leave the Manual with the Owner/Operator.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-9 Series and is the answer not in the manual?

BendPak XPR-9 Series Specifications

General IconGeneral
BrandBendPak
ModelXPR-9 Series
CategoryLifting Systems
LanguageEnglish

Related product manuals