XPR-9 Series Two-Post Lifts
48
P/N 5900371 — Rev. D2 — May 2023
Not to scale. Your Power Unit may be slightly different.
Note: The Up Button shown in the drawing above could be in a different location on the unit or
could be a switch instead of a button, depending on the Power Unit you have.
Make clear to your Electrician that all electrical work must conform to applicable local, state, and
federal codes, rules, and regulations.
To prepare the Power Unit:
1. Have the Electrician locate the Pigtail coming out of the Electrical Box on the Power Unit.
2. Open the Electrical Box, remove the Pigtail, and then either:
Wire the Power Unit directly into the facility’s electrical system.
Wire a power cord (with appropriate plug) inside the Electrical Box to the wiring that was
connected to the Pigtail.
Wiring information is either on the outside of the Power Unit under the Electrical Box or inside the
cover of the Electrical Box. Have the Electrician use that wiring information to wire the Power Unit
to the power source.
3. Fill the Hydraulic Fluid reservoir with approved Hydraulic Fluid.
The reservoir holds ≈3.5 gallons of Hydraulic Fluid, depending on which Power Unit you have.
When you receive the Power Unit, the reservoir is empty; you need to fill it.
Approved Hydraulic Fluids are any general-purpose ISO-32, ISO-46, or ISO-68 hydraulic oil or
approved automatic transmission fluids such as Dexron III, Dexron VI, Mercon V, Mercon LV, Shell
Tellus S4 / S3 / S2, or any synthetic multi-vehicle automatic transmission fluid.