XPR-9 Series Two-Post Lifts 58 P/N 5900371 — Rev. D2 — May 2023
Review Final Checklist Before Operation
Make sure these things have been done before putting the Lift into normal operation:
Review the Installation Checklist to make sure all steps have been performed.
Verify the Power Unit is getting power from the power source.
Check the Hydraulic Fluid reservoir; it must be full of approved Hydraulic Fluid or automatic
transmission fluid. You can harm the motor by running it without enough fluid.
Check the Hydraulic System for leaks. Verify all Hydraulic Hose connections, Hydraulic Fittings,
and Auxiliary Port Plugs on the Lift and Power Unit are tight.
Verify both Posts are plumb, shimmed, and stable.
Check to see that all Anchor Bolts are correctly torqued.
Apply white lithium grease to the inside of the Posts where the Slide Blocks move.
Make sure both Threaded Rods are in place and tightened near the top of both Posts.
Verify all Cables are properly positioned in their Sheaves.
Verify all Cable Sheave retaining pins and/or clips are secure.
Make sure both Safety Assemblies are connected and working normally.
Make sure that all Safety Locks are clear and free.
Make sure an Operational Test has been done.
Leave the Installation and Operation Manual with the owner/operator.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-9 Series and is the answer not in the manual?

BendPak XPR-9 Series Specifications

General IconGeneral
BrandBendPak
ModelXPR-9 Series
CategoryLifting Systems
LanguageEnglish

Related product manuals