XPR-9 Series Two-Post Lifts 58 P/N 5900371 — Rev. D2 — May 2023
Review Final Checklist Before Operation
Make sure these things have been done before putting the Lift into normal operation:
• Review the Installation Checklist to make sure all steps have been performed.
• Verify the Power Unit is getting power from the power source.
• Check the Hydraulic Fluid reservoir; it must be full of approved Hydraulic Fluid or automatic
transmission fluid. You can harm the motor by running it without enough fluid.
• Check the Hydraulic System for leaks. Verify all Hydraulic Hose connections, Hydraulic Fittings,
and Auxiliary Port Plugs on the Lift and Power Unit are tight.
• Verify both Posts are plumb, shimmed, and stable.
• Check to see that all Anchor Bolts are correctly torqued.
• Apply white lithium grease to the inside of the Posts where the Slide Blocks move.
• Make sure both Threaded Rods are in place and tightened near the top of both Posts.
• Verify all Cables are properly positioned in their Sheaves.
• Verify all Cable Sheave retaining pins and/or clips are secure.
• Make sure both Safety Assemblies are connected and working normally.
• Make sure that all Safety Locks are clear and free.
• Make sure an Operational Test has been done.
• Leave the Installation and Operation Manual with the owner/operator.