EasyManua.ls Logo

BendPak XPR-9 - Page 32

BendPak XPR-9
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
• Always call local service representative if electrical
problems develop.
• Always replace ALL FAULTY PARTS before lift is put
back into operation.
• Daily: Make a visual inspection of ALL MOVING
PARTS and check for excessive signs of wear.
• Daily: Check safety locks to ensure they are in good
operating condition.
• Daily: Check cables and sheaves for wear. Replace
worn parts as required with genuine BendPak parts.
• Daily: Inspect adapters for damage or excessive
wear. Replace as required with genuine BendPak
parts.
• Weekly: Lubricate all sheaves and rollers with
general purpose oil.
• Weekly: Check all cable connections, bolts and pins
to insure proper mounting.
• Monthly: Check equalizer cable tension. Adjust per lift
installation instructions.
• Monthly: Lubricate locking latch shafts. Push latch
handle several times for oil to penetrate pivot points.
• Every 3 Months: Check anchor bolt torque. Anchors
should be torqued to 90 ft/lbs.
• Semi-Annually: Check  uid level of lift power unit and
re ll if required per lift installation instructions.
• Replace all caution, warning or safety related decals
on the lift if unable to read or missing. Reorder labels
from BendPak.
• Refer to ANSI/ALI ALOIM booklet for periodic
inspection checklist and maintenance log sheet.
LIFT OPERATION SAFETY (CONT’D)
Make sure vehicle is neither front nor rear heavy and select the proper con guration for the vehicle to be
lifted (symmetric/asymmetric) as shown below. Center of balance should be midway between adapters.