EasyManua.ls Logo

BFI Automation CFC 200 - Transport, Installation and Connection

BFI Automation CFC 200
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport, Installation and Connection
4-1
4 Transport, Installation and Con-
nection
All installation and connection work may be carried out by
qualified and approved specialist staff only !
The legal regulations as well as adjustment instructions of
the plant operator have to be observed!
4.1 Scope of delivery
Compact Flame Controller CFC 200
Operating instructions
3 m Connecting cable (with ex-proof housing)
Harting cable terminal box kit (not with ex-proof hous-
ing)
4.2 Accessories (optional)
Power supply unit 230/115 V AC
1" swivel mount with 2" flange disk
1” 3-way-ball-valve
1” heating insulator
pressure barriers
Optical alignment device
Fiber optic cable
Refer to the order papers for the exact scope of delivery
and compare with the delivery note.
4.3 Checking for completeness
Check the entire delivery for completeness against the ac-
companying delivery note. Please refer to our terms of
sale and delivery otherwise.

Table of Contents

Other manuals for BFI Automation CFC 200

Related product manuals