CITY MANUAL INSTALLATION
Versie: 5.0 (04-06-2012) 13
- Control panel.
3. Connect the unit to the mains power supply.
4. Install the control panel and (any optional) connections to
external controls.
5. Finish the unit.
6. For models for connection to a Daikin direct expan-
sion system:
Connect the air curtain unit to the Daikin system.
7. Turn on the power supply and check the working of the
unit.
General instructions
Some parts of this section are applicable only to certain mod-
els. Where this is the case, it will be indicated. If no specific
model is referred to, the description applies to all models.
Note:
n Make sure you perform all installation operations
that are required for your unit.
Check the type plate and consult the manual if you
are not sure about the model or type of your unit.
Note:
n Protect the unit from damage and ingress of dust,
cement, etc. throughout the installation. You can, for
instance, use the packaging for protection.
See also:
2.4 Fixing the unit 14
2.5 Connecting the unit to the central heating installation 16
2.6 Connecting the unit to the Daikin system (CYQ and CYV) 17
2.7 Connecting the unit to the power supply 20
2.8 Installing control panel and external controls (CITY and CYV) 22
2.9 Control system without touch pad controller (CITY and CYV) 27
2.10 Finishing the unit 29
2.11 Switching on and checking function 33