RECOMMENDED INSPECTIONS AND PREVENTIVE MAINTENANCE
0
Changing UV lamps
At the end of their life span:
- either display on the Millénium III monitor: UV
intensity <50%
- or combined chlorine rate in the basin
OPERATIONS ON EACH UV LAMP
CHANGEOVER
AT LEAST ONCE
PER YEAR
Checking the general state of the UV
reactor
1 Replacement of quad ring seals Compulsory Compulsory
2 Checking the presence of quartz sheath
Teflon shims
Compulsory
3 Cleaning or replacing the quartz sheath Compulsory
4 Replacing the cleaning wipers Recommended
5 Cleaning the UV sensor Compulsory Compulsory
6 Check the operation of the flowmeter Compulsory
7 Check the operation of ventilators:
- Cleaning grills
- Filter replacement (if applicable)
Recommended
Compulsory
8 UV sensor calibration Only new lamps, quartz sheath clean or new, UV
sensor cleaned
9 Pneumatic silencer replacement Only in the event of corrosion
10 Check the earthing of the reactor
11 Check the operation of the thermostat in the
electrical cabinet
Recommended
12 Check the operation of the circuit breaker Recommended
13 Check tightening:
- Of terminal blocks in the cabinet
- Of connectors
- Of UV lamp connections
Recommended