5.2. TRANSPORTATION AND HANDLING OF PELLET BOILER
When moving the boiler, pay attention to your safety.
Before transport and handling of the boiler, which must be performed in complete safety, make sure
that the lifting capacity of transport equipment suffices. Avoid sudden and/or abrupt movement of
boiler.
ATTENTION
DISCARD ALL PACKAGING OUT OF REACH OF CHILDREN. DANGER OF SUFFOCATION WITH
BAG, FOIL, POLYSTYRENE ETC.
5.3. RESPONSIBILITY OF INSTALLER
It is the responsibility of the installer to check adequacy of installation and pipeline, ensure air intake
for combustion, ensures regulated distances and all other solutions, required for installation of the
pellet boiler.
It is the responsibility of the installer to ensure compliance with local legislation in force in the place of
pellet boiler installation.
Use of the pellet boiler must conform with instructions, provided in Instructions for use, maintenance
and installation, and all safety standards, specified by local legislation in the place of pellet boiler
installation.
Standard UNI 10683 defines duties of installer. The installer must check:
• type of device to be installed;
• adequacy of space for installation of unit, reflected by minimum required size of the space, in
which the pellet boiler will be installed;
• instructions of the manufacturer about heating device, regarding requirements of smoke gases
outlet;
• flue pipe internal diameter, the material it is made of, is it straight or even and that there are
no obstructions;
• height and, if required, vertical extension of flue pipe;
• existence and suitability of flue pipe cover resistance;
• possibility of outside air intake;
• possibility of simultaneous use of generator for connection with other equipment.
If the results of all above provided checks are positive, installation may proceed. Carefully heed to
instructions provided by the manufacturer, as well as safety and fire prevention standards in force.
After the first start-up of the boiler, perform a minimum 30-minute test of operation to check all
required demands.
When the installation is complete, the installer must provide the customer with the following:
• instructions for use, maintenance and installation from the manufacturer (if not included in
the unit);