ANTSPACE HK3 Water cooling container & Dry-Wet Tower Product Manual
71
After six months of equipment operation, the pipeline network should be inspected for leakage
prevention for six months. If any leakage or leakage is found, it should be immediately shut down for
maintenance.
Maintenance should first stop the operation of the load components on the user end, and then stop the
operation of the equipment for repair. After completing the leak detection, pay attention to
replenishing the system with coolant.
3) Maintenance of Electrical Components
After six months of equipment operation, it is necessary to inspect and maintain the wiring
terminals and crimping screws on the electrical components of the main control cabinet inside the
water pump cabinet to prevent looseness of the wiring terminals and crimping screws, which may
cause poor contact and damage to the components and prevent normal operation of the equipment,
thereby affecting the operation of the entire container Water cooling system.
4) Coolant Drainage
After 1-2 years of operation of the system and water tank, there may be some debris in the system
pipeline, and the system coolant should be promptly drained and replaced.
Operation Steps:
a) Find the position of the discharge valve (Figure 9-3).
b) Connect the drain hose to the drain ball valve and tighten it with a hose clamp; Guide the hose
outside the equipment and open valve V202 (Figure 9-3) to drain the system.