8 en | General installation RADION receiver SD
2020.05 | 13 | F.01U.261.834 Bosch Security Systems B.V.
2 General installation
Phases of installation
The installation of the RADION system is achieved by following
the sequential process as defined in this chapter. Overall, there
are four main phases;
– Planning
– Physical installation of the devices
– System enrollment/configuration
– System testing (walk test, pattern test)
It is essential that these steps or phases are adhered to in the
order mentioned above for proper functionality and operation.
When installing a RADION system, you must plan your
installation based on the control panel and RADION device
specifications, and the radio-frequency signal strength (RFSS)
between devices, receivers, and control panels.
Installation considerations
– RADION devices are intended only for indoor, dry
applications.
– Mount RADION devices on flat, rigid surfaces. Some devices
can be optionally corner mounted as indicated in the
installation instructions.
– Avoid mounting RADION devices in areas with large,
metallic objects, electrical panels, or electric motors. They
might reduce the radio-frequency (RF) range of a RADION
device.
– Avoid installing the devices where excessive humidity,
moisture, or temperatures outside of the acceptable
operating range exist.
– Wire all objects according to their specifications.
– RADION devices use batteries of varying types. When
installing batteries, observe safety and polarity
recommendations as indicated in the documentation for
those products.