EasyManua.ls Logo

Bosch Radion B810 - General Installation; Installation considerations

Bosch Radion B810
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 en | General installation RADION receiver SD
2020.05 | 13 | F.01U.261.834 Bosch Security Systems B.V.
2 General installation
Phases of installation
The installation of the RADION system is achieved by following
the sequential process as defined in this chapter. Overall, there
are four main phases;
Planning
Physical installation of the devices
System enrollment/configuration
System testing (walk test, pattern test)
It is essential that these steps or phases are adhered to in the
order mentioned above for proper functionality and operation.
When installing a RADION system, you must plan your
installation based on the control panel and RADION device
specifications, and the radio-frequency signal strength (RFSS)
between devices, receivers, and control panels.
Installation considerations
RADION devices are intended only for indoor, dry
applications.
Mount RADION devices on flat, rigid surfaces. Some devices
can be optionally corner mounted as indicated in the
installation instructions.
Avoid mounting RADION devices in areas with large,
metallic objects, electrical panels, or electric motors. They
might reduce the radio-frequency (RF) range of a RADION
device.
Avoid installing the devices where excessive humidity,
moisture, or temperatures outside of the acceptable
operating range exist.
Wire all objects according to their specifications.
RADION devices use batteries of varying types. When
installing batteries, observe safety and polarity
recommendations as indicated in the documentation for
those products.

Table of Contents