IMPORTANT: All the previous Pre-Installation sections must be read
and requirements
met
before starting boiler or flue installation.
G
E
F
~
~
N~M
~~H
~L
~~
0
~
7
0
·-...;..,-..:......--p
~A
UNPACKING WALL FRAME
AND
ANCILLARY ITEMS
LIFTING
AND
CARRYING PRECAUTIONS:
Lift only a manageable weight,
or
ask for
help.
When
lifting the boiler, bend the knees,
and keep the
back
straight and feet apart.
Do
not
lift and
twist
at the same time.
Lift and carry the
boiler close to the body.
Wear
protective clothing and gloves
to
protect from any sharp edges.
A-
Carton
B -
Wall mounting plate
C
- Hanging bracket
D - Hardware
pack
1
E - Hardware
pack
2 (gas cock)
F - Literature
pack
G -
Bottom
panel
H - Trap I Syphon Outlet Connection
(22 mm
Plastic Pipe)
J - Flow pipe
K - Return pipe 1
L - Return pipe 2
M - Pipework mounting bracket
N -
Gas
cock
support
plate
0
- Braising template
P - Upper
support
(polystyrene)
0
- Carton cover
IMPORTANT
HANDLING
INSTRUCTIONS
It is advised that
two
people are used
to
carry the carton from the van to the point
of
delivery.
Once
the carton has been delivered, the
top
of
the carton is opened. If a sharp imple-
ment is used make sure the carton is not
pierced and that the
implement
is
used
in
such a way so that it may not cause person-
al
injury. All sharp
objects
must be covered
or the
blade retracted after use and put
away
in
a safe place.
~
1.
The
upper
support
is
now
removed with
the
components
(bottom panel,
pipework
mounting bracket, return pipe
2,
gas
cock
support
plate, braising template, fixings,
documentation set, hanging bracket).
Open
the
support
cover
to
teke the components.
~
2.
The boiler wall mounting plate as well as
flow and return pipe 1 can
now
be pulled out.
Additional requirements for roof space installation:
The boiler should be first unpacked before
ascending
ladder
to
loft space.
Two sets
of
steps should be used.
Two
people should share the lifting
of
the
boiler
up
to the loft hatch, where the boiler
is entered into the loft space tilted and slid
on its
back
into the loft.
Once
the appliance
is
removed from its packag-
ing check the contents against the packing list.
Before
installing
appliance
ensure
system
has
been
cleaned
as
explained
on
page
8.
UNPACKING
WALL
FRAME
AND
ANCILLARY ITEMS
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
~ORCESTER
6 720
614
556a
(2007/07)
Bosch
Group