THE
SETTING
OF
THE
GAS
RATIO
MUST
BE
CARRIED
OUT
BY A
COMPETENT
PERSON
SETTING OF THE GAS RATIO MUST NOT BE ATTEMPTED UNLESS THE PERSON CARRYING OUT
THE
CONVERSION
IS EQUIPPED WITH A
COMBUSTION
ANALYSER
CONFORMING
TO
BS
7927
AND
IS COMPETENT
IN
ITS
USE
...
---
...
,,""''
........
'
1,'
,1-
'\
I \
I \
I I
I
I
I
-------------.,
L---(
~
1----1
I f I
I I
\ I
\ I
' I
',,
A__..~
-,/
...........
.:;../'-~
@ I
SETTING THE GAS/AIR RATIO
5. Setting the
C0
2
5.1
~
Connect
manometer
to
inlet pressure
point on the
gas
valve.
~To
adjust the
C02
it will
be
necessary to
first operate the
boiler at maximum output.
~
Press and hold
down
the
boost
button (A)
for
10
seconds
until illuminated.
5.2~
Turn
heating control
to
maximum; the boil-
er will then
go
to
maximum output.
Note: The control will resume normal opera-
tion after 15 minutes
or
if the
boost
button is
pressed for over a second.
5.3~
Using a flat blade screwdriver
set
the
C02
via adjuster (B) using table below.
Note:
C02
should
be
measured 10 minutes
after
firing
the appliance.
Gas type
I
co2_
setting I
C?~
setting
max1mum m1mmum
Greenstar 30CDi
Natural
gas I
9.6%
±0.2
1
9.0%
±0.2
LPG
I
11.5%
±0.2
1
10.5%
±0.2
Greenstar 40CDi
Natural
gas I
9.7%
±0.2
1
9.1%
±0.2
LPG
I
11.5%
±0.2
1
10.5%
±0.2
~
Check
CO
is less than
200
ppm.
~Measure
the inlet pressure; it should
be
a
minimum
of
18 mbar for natural
gas
and
37
mbar for
LPG.
5.4~
Set
the heating control
to
minimum. This
will make the boiler
go
to minimum power.
5.5~
Measure the
C02;
it should
now
be
at the
figure for minimum output.
If not adjust (C)
on the
gas
valve until correct.
~
Return to maximum and re-check the
C02.
If
correct
press and hold
down
the
boost
button for 2
seconds;
the button will
cease
to
be
illuminated and the blue
power
indicator will
be
permanently illuminated.
~
Remove manometer and re-seal inlet pres-
sure point on gas valve.
~
Fit
new
plastic sealing
cover
on
to
outlet
adjuster (B).
~
Fit
white
cover over valve adjuster (C) and
secure with
black
security tag.
~
Remove red
arrow
from
data
plate and fit
new
one
in
correct
position for gas type.
~
Re-assemble and refit boiler case.
~
Re-connect mains electrical supply and
check
boiler operation as stated
in
the com-
missioning section.
~
Fit
new
label from kit over existing label on
the
appliance
bottom
panel.
SETTING
THE
GAS/AIR
RATIO
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
~ORCESTER
6 720
614
556a
(2007/07)