INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR
30CD,/40CD'
Conven\1onal
Bosch
Group
6 720 614 556a (2007/07)
FINISHING COMMISSIONING
The
boiler
has
been
factory
set,
so
there
should
be
no
need
to
adjust
combustion
settings.
REPLACE OUTER CASING:
Replace
outer casing making sure that the
securing points are
properly located.
~
Press the clip
(A)
downwards to secure
casing
on
top.
~
Retighten bottom two screws (B).
INSTALLING BOTTOM PANEL:
2
The
bottom panel slides onto two ledges
(C)
either side
of
the boiler frame.
~
Hold the panel up against the underside
of the
boiler and slide towards the rear until
it is fully engaged.
HAN
DOVER:
~
Complete the Benchmark check list.
~
Open the facia cover
by
gently pressing the
centre top of the cover
(D).
~
Set up the controls and show the user how
to operate
all the controls shown
in
the User
Guide.
~
Place the user guide into the tray
(E)
on
the
inside of the facia cover.
~
If the appliance is unused and exposed to
freezing conditions; shut off
all the mains
supplies and drain the system and boiler .
.,.,.-
...
------
.................
/~""
....
,,
'\
\
\
------
~
\
D
E
/
/
FINISHING COMMISSIONING