EasyManua.ls Logo

Bosch Worcester Greenstar Utility 32/50 - Combustion Chamber

Bosch Worcester Greenstar Utility 32/50
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection and maintenance
Greenstar Utility
ErP -
6 720 821 751 (2018/04)36
Identify the protruding lower edge [3] of the heat exchanger
Fig. 53 Protruding edge
Present the lower edge of the flue manifold [4] to the lower edge of
the heat exchanger and ensure that the flue manifold edge [4] is
located under the protruding edge [3] of the heat exchanger
Fig. 54 Locate on bottom edge
With lower edge of the flue manifold in place, rotate the manifold up
to the heat exchanger ensuring that the lip [5] on the flue manifold is
on top of the heat exchange as shown in figure 55.
Fig. 55 Locate lip of flue manifold
Tighten the four bolts [6] gradually in a rotating sequence until the
flue manifold is securely seated on the Heat exchanger.
Fig. 56 Tighten bolts
7.3.3 Combustion chamber
Remove the six retaining nuts and washers [1].
Remove combustion chamber access door [2]
Check that the combustion chamber seal [3] is in good condition
replace if necessary.
Remove the baffle [4], check the condition of the baffle, clean or
replace as necessary.
Thoroughly clean all of the heat exchanger surfaces using a suitable
brush and clear all loose debris from the combustion chamber.
Refit the baffle, ensuring it is fitted correctly.
Check the condition of the combustion chamber access door
insulation. If the insulation is damaged the door assembly must be
replaced.
Refit combustion chamber door [2].
IMPORTANT: Secure with nuts and washers [1] and tighten
gradually in the sequence shown in figure 57, do not over tighten the
nuts.
Fig. 57
3
6720821751-53.1Wo
6720821751-54.1Wo
4
3
5
6720821751-55.1Wo
6
6
6
6
6720821751-56.1Wo
4
3
2
1
6720821751-11.1Wo
1
2
3
4
6
5

Table of Contents

Related product manuals