EasyManua.ls Logo

Brooks RFS1 V2 - 11 Commissioning Checklists

Default Icon
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation & Installation Manual RFS1 V2
MA365 Rev 3
39 of 46
11 Commissioning Checklists
RFS1 V2 SYSTEM
Installer’s Statement
Page 1 of 2
1.
Building Name
2.
Address
3.
Is the system monitored? YES/NO If YES, by whom:
4.
Name of nearest Fire Brigade Station Phone:
5.
Type of Panel: RFS1 V2 Serial No.:
6.
Number of Alarms connected:
7.
Describe any ancillary equipment installed and connected to the RFS1 V2 Panel.
8. Main Supply Voltage
9. Battery Type and Capacity
10.
Nominal Battery Voltage (13.8 V
DC
)
11.
Maintenance Agreement held by
12.
Has Log Book been supplied YES/NO
13.
Have as-installed drawings been supplied
YES/NO

Table of Contents