Operation & Installation Manual RFS1 V2
MA365 Rev 3
39 of 46
11 Commissioning Checklists
RFS1 V2 SYSTEM
Installer’s Statement
Page 1 of 2
1.
Building Name
2.
Address
3.
Is the system monitored? YES/NO If YES, by whom:
4.
Name of nearest Fire Brigade Station Phone:
5.
Type of Panel: RFS1 V2 Serial No.:
6.
Number of Alarms connected:
7.
Describe any ancillary equipment installed and connected to the RFS1 V2 Panel.
8. Main Supply Voltage
9. Battery Type and Capacity
10.
Nominal Battery Voltage (13.8 V
DC
)
11.
Maintenance Agreement held by
12.
Has Log Book been supplied YES/NO
13.
Have as-installed drawings been supplied
YES/NO