BASEFRAME AND PEDESTAL ASSEMBLY
FIGURE THREE
FIGURE THREE
FIGURE FOUR
FIGURE FOUR
Step #5: Place base frame on top of pedestal. Loosely
attach four right angle metal brackets, two at each end
of each side sill, using 3/8-16 x 2 1/2 hex head bolts,
3/8 at washers, and 3/16 hex nuts.
Step #6: Loosely attach metal brackets to each pedestal
using 1/2-13 x 2 1/2 hex head bolts and 1/2 at washer.
Tighten all attachment hardware insuring the base frame
is securely attached to the pedestal.
Step #7: Position the assembly in its permanent location.
Step #8: Using a precision leveling devise, place shims
under pedestal foot pads as needed to insure the top
surface of the base frame is level prior to placing slate.
PAGE 4BRUNSWICK INSTALLATION MANUAL
CENTENNIAL
3/8-16 x 2-1/2”
HEX HEAD SCREW
3/8” WASHER
1/2-13 x 2-1/2”
HEX HEAD SCREW
1/2” WASHER
3/8 HEX NUT
3/8 WASHER
SHIM