BÜCHI Labortechnik AG Installation | 5
Operation Manual Vacuum Pump V-100 25/52
Fitting secondary condenser into the holder and connecting up
Fig.12: V-100 with secondary condenser connected
1 Connection piece 4 Secondary condenser outlet
2 GL14 cap nut 5 Ball joint clamp
3 Pump outlet 6 Receiving flask
u Push secondary condenser together with connection piece (1) and GL14 cap nut
(2) fully home into holder from above.
u Fit the unattached end of the connection piece into the pump outlet (3).
u Screw the GL14 cap nut (2) on the connection piece onto the thread on the pump
outlet.
u Fit receiving flask (6) underneath the secondary cooling cold trap and fix with ball
joint clamp (5).