EasyManua.ls Logo

Buchi V-100 - Maintenance: Pump Head Servicing; Pump Head Dismantling and Reassembly

Buchi V-100
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BÜCHI Labortechnik AG Cleaning and servicing | 7
Operation Manual Vacuum Pump V-100 35/52
7.2.2 Dismantling and reassembling pump head
Removing pump top cover
Fig.18: V-100 with pump top section opened up
1 Rubber surrounds
Precondition:
R Pump has been shut down.
u Unscrew the two knurled-head screws on the rear of the V-100 and remove the
pump top cover.
u Remove the rubber surrounds (1) from the pump intake and pump outlet.
Removing pump-head connection piece
3
4
1
1
2
Fig.19: Pump-head connection piece with union nuts between the two pump heads
1 Screw (elbow connection) 3 Pump-head connection piece
2 Elbow connection 4 GL14 cap nut
u Unscrew two screws (1) from each of the two pump heads, and remove the elbow
connections (2) together with the pump-head connection piece (3) from the pump
heads.
u Unscrew the GL14 cap nuts (3) from the elbow connections.
u Pull the GL14 cap nuts off the pump-head connection piece (4).

Table of Contents

Related product manuals