8 Inspection/maintenance
8.1 General notes
Offer your customer an annual contract covering
inspection and demand-dependent service. Refer to the
“Inspection and maintenance reports” Chapter 8.6 for
information about what such contracts should contain.
8.2 Preparing the boiler for inspection
and maintenance
B Shut down the heating system (Æ Chapter 7).
B Check the general condition of the heating system.
B Visually and functionally check the heating system.
B Check all system parts that carry fuel or water for leaks
and visible corrosion.
The operator is obliged under the terms of
paragraph 9 of the heating plant legislation to
arrange to have the heating system cleaned
and maintained.
B The entire condensing unit (including any
neutralisation device) must undergo
maintenance once a year.
B We recommend arranging an inspection
and maintenance contract.
B For burner maintenance, follow the burner
manufacturer’s maintenance instructions.
DANGER: Risk to life from electricution
when the heating system is open!
B Before opening the heating system,
disconnect the heating system from the
power supply by means of the emergency
isolation switch or the relevant circuit
breaker in the main fuse board.
B Prevent unintentional reconnection of the
electricty supply.
DANGER: Risk to life from gas explosion!
B Any work on components may only be
carried out by an approved contractor.
EN 303 permits an amount of leakage from
the hot gas side of the boiler.