EasyManua.ls Logo

C-Com iNetVu 755 - Step 4: Testing the 7000 Controller

C-Com iNetVu 755
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
iNetVu New Gen Troubleshooting Guide
C-COM Satellite Systems Inc.
Step 4: Testing the 7000 Controller.
a. Disconnect the sensor cable from the 7000 Controller and place the paper clip on the
connector shorting out pins corresponding to the Switch you wish to test.
5&9 and 5&18 for Elevation ST
b. From the iNetVu Mobile 7000 Controls screen does the Elevation ST come ON?
If YES, this concludes the Sensor Cable has failed
If NO, this concludes the 7000 Controller has failed
Please contact C-COM Technical Support for further assistance at
support@c-comsat.com

Table of Contents