EasyManuals Logo

Carrier 59TN6A User Manual

Carrier 59TN6A
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #51 background imageLoading...
Page #51 background image
s_ r
UPFLOW LEFT CONFIGURATION
Any other unused
knockout be used
may
for combustion air
connection.
Rotate vent elbow to
required position.
A11309
00 '>: :.... l k'j
Any other unused __0 &_._5)
knockout may be used _ _. - ,_
connection. _ _ _:!_"o
Rotate vent elbow to (D
required position.
UPFLOW RIGHT CONFIGURATION
A11308
Any otherunused
knockout may be used
_rcombustion air
connedion.
UPFLOW VERTICAL VENT
A11310
C) Attach vent pipe adapter with gasket to furnace casing.
Align notches in rubber coupling over standoffs on adapter. Slide clamps over the coupling.
(_ Slide vent pipe through adapter and coupling into vent elbow.
1_ Insert vent pipe into vent elbow.
(_ Torque all clamps 15 lb.-in.
@ Attach combustion air pipe adapter with gasket to furnace.
(_ Attach combustion air pipe to adapter with silicone. Pilot drill a 1/8-in.
hole in adapter and secure with a #7 x 1/2-in sheet metal screw.
Fig. 39 - Upflow Configurations (Appearance may vary)
A11399
51

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier 59TN6A and is the answer not in the manual?

Carrier 59TN6A Specifications

General IconGeneral
Model59TN6A
TypeGas Furnace
StagesTwo-stage
Blower TypeVariable-speed
Fuel TypeNatural gas
Heating Capacity40, 000 to 120, 000 BTU/h
Warranty10-year parts limited warranty

Related product manuals