EasyManua.ls Logo

Carrier 59TN6A - Combustion Air and Vent Pipe Termination for Direct Vent System; Vent Pipe Termination for Non-Direct Vent

Carrier 59TN6A
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
clearance above
Con_ntric Vent and Corn bustion Air
Roof Termination {ptefurted) ...........
\\\\\
Fig. 47 - Combustion Air and Vent Pipe Termination for Direct Vent (2-Pipe) System
A05090
Roof Termination (Preferred)
cr_ 305mm)
mnmum earance
above highest a_licipated
snow bevel maximum of
24 in (610ram) above roof
[i::::°i
Abandoned masonry
used as raceway
(percode)
12 in rain (305 mm)fron
overhang or roof
6 in (152ram) minimum clearance
between wal[ aid end of vent pipe
10 in (254mm) maximum pipe [enql]
Side walHermination
with 2 ehbows (preferred)
12 in (305 ram) rain from
overhang or roof
Maintain 12 in (305ram)
minimum clearance
above highest a_licipated
snow level or grade
whichever is greater
_O5mm)
ghest anticipated
snow level or grade
whichever is greater
Sidewall Termination
with Straight Pipe (preferred)
Fig. 48 - Vent Pipe Termination for Non-Direct Vent and Ventilated Combustion Air System
A05091
58

Table of Contents

Related product manuals