23
DCV Minimum and Maximum Position
To check the DCV minimum and maximum position:
1. Make  sure EconoMi$er  IV  preparation  procedure has been
performed.
2. Connect  a  9-v  battery  to  AQ  (positive  node)  and  AQ1
(negative node). The DCV LED should turn on. The actuator
should drive to between 90 and 95% open.
3. Turn the DCV Maximum Position potentiometer to midpoint.
The actuator should drive to between 20 and 80% open.
4. Turn  the  DCV  Maximum  Position  potentiometer  to  fully
CCW. The actuator should drive fully closed.
5. Turn the Minimum Position potentiometer to midpoint. The
actuator should drive to between 20 and 80% open.
6. Turn  the  Minimum  Position  potentiometer  fully  CW.  The
actuator should drive fully open.
7. Remove  the  jumper  from  TR  and  N.  The  actuator  should
drive fully closed.
8. Return EconoMi$er  IV  settings  and  wiring  to  normal after
completing troubleshooting.
Supply-Air Input
To check supply-air input:
1. Make  sure EconoMi$er  IV  preparation  procedure has been
performed.
2. Set  the  Enthalpy  potentiometer  to A. The  Free  Cool  LED
turns on. The actuator should drive to between 20 and 80%
open.
3. Remove the  5.6 kilo-ohm resistor and jumper T to T1. The
actuator should drive fully open.
4. Remove  the  jumper  across T  and  T1.  The  actuator  should
drive fully closed.
5. Return EconoMi$er  IV  settings  and  wiring  to  normal after
completing troubleshooting.
EconoMi$er IV Troubleshooting Completion
This procedure is used to return the EconoMi$er IV to operation.
No troubleshooting or testing is done by performing the following
procedure:
1. Disconnect power at TR and TR1.
2. Set enthalpy potentiometer to previous setting.
3. Set DCV maximum position  potentiometer  to previous  set-
ting.  Note:  when  not  using  a  CO
2
  sensor  the  DCV  Max
potentiometer must be fully closed (CCW) for the Minimum
Position potentiometer to function correctly.
4. Set minimum position, DCV set point, and exhaust potenti-
ometers to previous settings.
5. Remove 620-ohm resistor from terminals SR and +.
6. Remove 1.2  kilo-ohm  checkout resistor  from terminals  SO
and +. If used, reconnect sensor from terminals SO and +.
7. Remove jumper from TR to N.
8. Remove jumper from TR to 1.
9. Remove  5.6  kilo-ohm  resistor  from  T  and  T1.  Reconnect
wires at T and T1
.