INSTALLATION
HARDWIRE REQUIREMENT
The oven requires permanent connect wiring (commonly known as hardwiring). Wiring to the power
source must be performed by a qualified electrical technician. All other Installation steps may be
performed by the operator.
INSTALLATION PROCEDURE CHECKLIST
Carry out the procedures and steps listed below to install the oven in a new workspace location and
prepare it for use. All procedures are found in the Installation section of this manual.
Pre-Installation
Check that the required ambient condition for the oven are met, page 16
Check that the spacing clearance requirements are met, page 16
Unit dimensions may be found on page 5
Check for performance-disrupting heat and cold sources in the environment, page 17
Check that a suitable permanent connect electrical power supply is present, page 17
Install the oven in its workspace location
Review the lifting and handling instructions, page 18
Install the leveling feet, page 19
Install the oven in its workspace location, page 19
The oven may be connected to its power supply after this procedure.
Set up the oven for use
Clean the oven chamber and shelving if needed, page 19
Install the shelving, page 20

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cascade CDO-28 and is the answer not in the manual?

Cascade CDO-28 Specifications

General IconGeneral
BrandCascade
ModelCDO-28
CategoryLaboratory Equipment
LanguageEnglish