EasyManua.ls Logo

Cascade CDO-28 - Final Installation Steps

Cascade CDO-28
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 | Page
cascadesciences.com | Tel. 503 847-9047
INSTALLATION
INSTALL THE SHELVING
The horizontal airflow within the chamber moves from the small duct holes on the right-hand side of the
chamber to the large holes on the left side. Place the shelves as not to obstruct the duct holes on either
side. This maximizes airflow across the shelf space.
Space the shelves evenly in the oven chamber to ensure the best possible air circulation and
temperature uniformity.
1
2
Top 1
st
Top 1
st