EasyManua.ls Logo

Cascade E-Series - Page 7

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
215204 Rev. 1 5
I
NSTALLATION
Prepare Hoses
A Determine hose lengths required for hydraulic
supply configuration of truck.
B Cut hoses to length, install end fittings.
CL0589.ill
CL0585.ill
Sideshifting – Double Hose Reels
Sideshifting – Double Internal Hose Reeving
Sideshifting with Solenoid – IHR and Cable Reel
Sideshifting with Solenoid – 6-N-1 Cable/Hose Reel
OpenSideshift Left
Sideshift Right
Clamp
CL0588.ill
CL0586.ill
SSL / Open
(TANK Port)
SSR / Clamp
(PRESSURE Port)
Flush hydraulic supply hoses
A
Install hoses using union fittings.
B Operate auxiliary valves for 30 sec.
C Remove union
fittings.
4
GA0092.ill
Non-Sideshifting – Single Hose Reel
CL0587.ill
Clamp
Open
Solenoid
Cable
3
IMPORTANT: Main valve options include LH or RH
CLAMP/OPEN porting, or dual porting which allows
hoses to be plumbed to either side of the Clamp to
match existing truck hydraulic supply configurations.