215204 Rev. 1 5
I
NSTALLATION
Prepare Hoses
A Determine hose lengths required for hydraulic
supply configuration of truck.
B Cut hoses to length, install end fittings.
CL0585.ill
Sideshifting – Double Hose Reels
Sideshifting – Double Internal Hose Reeving
Sideshifting with Solenoid – IHR and Cable Reel
Sideshifting with Solenoid – 6-N-1 Cable/Hose Reel
OpenSideshift Left
Sideshift Right
Clamp
CL0588.ill
CL0586.ill
SSL / Open
(TANK Port)
SSR / Clamp
(PRESSURE Port)
Flush hydraulic supply hoses
A
Install hoses using union fittings.
B Operate auxiliary valves for 30 sec.
C Remove union
fittings.
4
GA0092.ill
Non-Sideshifting – Single Hose Reel
CL0587.ill
Clamp
Open
Solenoid
Cable
3
IMPORTANT: Main valve options include LH or RH
CLAMP/OPEN porting, or dual porting which allows
hoses to be plumbed to either side of the Clamp to
match existing truck hydraulic supply configurations.