3-CONTROLS/INSTRUMENTS
Boomandupperstructureswingleft-hand
controllever(optional)
Thespeedofmovementoftheboomortheupperstruc-
tureswingdependsonthecontrollevertiltangle.Inthe
intermediatepositiontwomovementscanbeobtainedsi-
multaneously.
NOTE:Whentheupperstructureswingcontrolisre-
leased,theupperstructuremaycontinuetorotatedueto
theforceofinertia.Inthisevent,makeallowanceforthe
extramovementbyreleasingthecontrolslightlyearlier.
VF3UDD-0015
(1)Theboomlowers.
(2)Theboomraises.
(3)Theupperstructureturnstotheleft.
(4)Theupperstructureturnstotheright.
VF3UDD-002Z6
Armandbucketright-handcontrollever(op-
tional)
Thespeedofmovementofthearmorthebucketdepends
onthecontrollevertiltangle.Intheintermediateposition
twomovementscanbeobtainedsimultaneously.
FIQCKA-0017
(5)Thearmextends.
(6)Thearmretracts.
(7)Thebucketretracts(lling).
(8)Thebucketextends(dumping).
FIQCKA-002X8
3-10