FINALIZATION OF INSTALLATION
Check all wiring connections with either an ohm meter or a buzz to verify continuity of all wires.
Check all led proxy switch lights (power).
Wiring and wire runs should be installed as not to interfere with equipment operation and in accordance
with appropriate electrical code.
Make a rotational check of all motors. If phases are reversed, this can be corrected by changing two
power wires in the motor junction box.
All gear reducers are sealed. They are factory sealed to ensure proper operating temperature and
prolonged life.
Check air pressure at all regulators and set per the pneumatic schematic.
(OPTIONAL) Fill all the air lubricator reservoirs if equipped. All cylinders and solenoids don’t require
lubrication).