EasyManua.ls Logo

CEM MARS 6 Synthesis - Page 63

CEM MARS 6 Synthesis
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
Appendix B: EasyPrep and EasyPrep Plus Vessels
• The control vessel requires the taller frame (except EasyPrep with temperature control only)
• The standard vessels and EasyPrep with temperature control only require the shorter frame.
• If the cover has pressure control, select the “Easy Prep Plus” control frame module and position the pressure
connector so it passes through the frame and aligns toward the outside of the frame.
10. Verify vertical placement by ensuring the sleeve is aligned on the disc at the bottom of the frame.
11. Tighten the screw onto the top of the load disc until it is nger tight.

Table of Contents