EasyManuals Logo

CEM ORACLE Manual

CEM ORACLE
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #49 background imageLoading...
Page #49 background image
45
ORACLE Testing with a SMART 6
12. Prepare (wrap) the sample for analysis. View “Sample Preparation using the ORACLE Station” section for de-
tailed information.
13. If there is an ORACLE tube from a previous analysis in the ORACLE, it must rst be removed.
14. Place the ORACLE tube in the QuikPrep heater at the top of the ORACLE magnet. QuikPrep contains a sensor
that will automatically detect the sample is present, and begin heating the sample for a predetermined length
of time.
15. The ORACLE will then heat the sample accordingly, before automatically dropping it into the magnet for fat
analysis. Please do not use either interface during this brief period of sample analysis, unless to cancel the
test by pressing the X in the top left corner of the screen.
16. After conditioning the sample to the correct temperature, the ORACLE will begin the process of analyzing the
sample.
17. Once the scans are complete, the result will appear. Select Continue to run the method again or the back icon
to exit the method.

Other manuals for CEM ORACLE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CEM ORACLE and is the answer not in the manual?

CEM ORACLE Specifications

General IconGeneral
BrandCEM
ModelORACLE
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals