EasyManua.ls Logo

Centurion Vantage - Operator Installation - Inward Opening Gates; Step 1: Determine Installation Distances

Centurion Vantage
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 27www.CentSys.com
SECTION 9
21. Solar Panel Wiring9. Operator Installation - Inward Opening Gates
OPERATOR INSTALLATION - INWARD OPENING GATES
Ensure that the gate mass does not exceed the specications on
page 14.
Figure 17 illustrates the values corresponding to the Inward Opening Gate Installation
Tables.
FIGURE 17. BRACKET POSITION - INWARD OPENING GATE
A
B
E
Wall
VANTAGE
operator
Gate in closed position
9.2. Step 1
Measure the E-Value and ensure that it does not exceed values shown in Figure 8 and
Table 10 on page 21.
Depending on the gate opening angle determined in Section 6.2 and the E-Value
measured, determine the installation distances for the A- and B-Value using the Tables
shown on pages 29 to 31.
9.1. Key terms used in this section
9.1.1. E-Value
The distance from the centre of the gate hinge to the edge of the pillar.
9.1.2. A-Value
The horizontal distance from the Wall Bracket/pivot pin to the center of the gate hinge.
9.1.3. B-Value
The vertical distance from the Wall Bracket/pivot pin to the center of the gate hinge.

Related product manuals