Specify when to switch from one TOU schedule to
another. Writing 0xFFFFFFFF to this parameter
disables switching between TOU schedules.
Table 4-12 TOU Setup Parameters
For each of the 4 Tariff Rates, the PMC-340 provides the following information:
Energy: kWh Import/Export, kvarh Import/Export, kVAh – Per Phase and Total
Peak Demand: kW/kvar/kVA of This Month (Since Last Reset) and Last Month (Before Last Reset).
TOU data is available through communications.