11
INSTALLATION
TYPES OF INSTALLATIONS
PAD MOUNT INSTALLATION
POST MOUNT INSTALLATION
Operator
Pad
Operator
Posts
• To AVOID damaging gas, power or other underground utility lines,
contact underground utility locating companies BEFORE digging
more than 18 inches (46 cm) deep.
• DO NOT touch the heater when switch is on, heater may be hot.
• To prevent damage to the operator or gate, DO NOT drive the limit
(nuts) actuators on the shaft past their normal positions.