INSTALLATION
STEP 1
INSTALL THE OPERATOR
Check the national and local building codes before installation.
PAD MOUNT INSTALLATION
RETRO-FIT INSTALLATION
The operator is shipped from the factory with the lower mounting angles
configured out (Figure 1). If you have pad constrictions, either angle can
be unbolted and reversed to angle in. NOTE: If you are replacing an
SL580 and wish to use the same pad mounting hardware, the gate side
mounting angle must be installed angle in.
NEW INSTALLATION
1. Lay out concrete pad.
2. Install the electrical conduit.
3. Pour a concrete pad (reinforced concrete is recommended).
4. Secure operator to the concrete pad using four 1/2" concrete anchors
(not provided).
2" to 4" (5.1 to 10.2 cm)
Above Grade
Depth Required By Local
Codes or Below Frost Line
OUT
IN
Figure 1
1/2" Concrete
Anchors
(4 Required)
Power and Control
Wiring Must Be Run
In Separate Conduit
(Conduit Location)
(Gate)
1" (2.5 cm)4" (10.2 cm)
36" (91.4 cm)
18" (45.7 cm)
Drive and idler
sprocket toward
gate side