Model 108 FLEX-AUGER Installation Manual
( 28 )
Control Unit & Power Unit Installation
1. Attach the Tube Anchor to the end of the Control Unit. Place a
flat washer on each bolt that fastens the Tube Anchor to the
Control Unit. See Figure 13.
Figure 13. Control Unit/Power Unit assembly procedure.
2. Attach the power unit to the control unit using the 5/16-18
machine screws installed on the face of the gearhead and the flat
washers packed with the control.
3. 3-Phase Applications: Power Units/Control Units do not include all
the electrical components shown. Components must be
purchased locally to match local and national electrical codes.
Skip to step 4.
1-Phase Application: Connect the electrical wires on the power
unit to the control unit. The power unit is shipped with the
electrical connectors attached. Flex cable is shipped with the
control unit.
a)Install a red plastic anti-short bushing in one end of the flex
cable. Push the anti-short bushing into the end of the cable so
that the wide lip covers the edge of the metal to protect the
wire insulation.
b)Push the power unit wires through the flex cable starting in the
end with the anti-short bushing. Be careful not to damage the
insulation on the wires.
Key Description
1 Power Unit
2 5/16-18 Screws
3 Control Unit
4 Flexible Cable
5 Anti-Short Bushing
6 90 Degree Connector
7 Tube Anchor

Other manuals for Chore-Time FLEX-AUGER 108

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Chore-Time FLEX-AUGER 108 and is the answer not in the manual?

Chore-Time FLEX-AUGER 108 Specifications

General IconGeneral
BrandChore-Time
ModelFLEX-AUGER 108
CategoryIndustrial Equipment
LanguageEnglish