| INSTALLATION MANUAL PRORAPID
Periodical Checks
Periodic checks of the units must be
performed by qualied personnel in order to
guarantee the appliance eciency
and correct system operation, regular
maintenance is recommended to ensure
optimum operational performance and
tomeet safety requirements.
In the event that problems do occur during
the hot water generation, turn it o and do
not attempt to repair it please consult a
qualied technician.
Important Information
These instructions must be read and
understood before installing, commissioning,
operating or maintaining the equipment.
Installation & Commissioning
Read this installation and commissioning
manual and where necessary refer to
appendix C before commencing, the
CHWS ProRapid semi instantaneous DHW
Generator is a controlled service as dened
in the latest edition of the building regulations
and should only be tted by a competent
person. Installation & Commissioning of
equipment by accredited agents or specialist
sub-contractors will ensure the equipment is
operating safely and eciently.
The installation should also be in
accordance with the British Standard Codes
of Practice, current Building Regulations,
, i.e. Health & Safety Document No. 635
(The Electricity At Work Regulations
1989), and the Water Supply (Water
ttings) Regulations, BS 5449:1990
Forced circulation hot water systems , BS
6700:2006 Design, installation, testing and
maintenance of services supplying water.
The relevant regulations are: England and
Wales – Building Regulation G3; Scotland
– Technical Standard P3; North Ireland –
Building Regulation P5.
Failure to install this appliance correctly
could lead to prosecution and will invalidate
the guarantee.
It is in your own interest and that of safety to
ensure that the law is complied with.