5.3 THREE-PHASE NETWORK MEASURING WITH A 3-WIRE CONNECTION
The CVM-C4 has 18 display screens in the three-phase network measurement system with a 3-wire
connection, Table 11.
Use the keys and to browse through the different screens.
The display screens can change automatically depending on the time programmed in the section
“6.5.2.- CYCLIC DISPLAY”.
The initial display screen, i.e. the first screen displayed when feeding the device or when exiting the
configuration menu, can be programmed in section “6.5.4.- INITIAL DISPLAY SCREEN”.
Table 11: Display menu: Three-phase network measuring with 3-wire connection.
Display menu: Three-phase network measuring with 3-wire connection.
3800
L1-2
3801
3803
V
L2-3
L3-1
.
.
.
Phase-Phase Voltage (V / kV)
(5)
5011
L1
5012
5013
A
L2
L3
.
.
.
Current (A / kA)
(6)
5000
Hz
.
Frequency (Hz)
5700
W
Ʃ