EasyManuals Logo

Cirrus SR22T User Manual

Cirrus SR22T
506 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #461 background imageLoading...
Page #461 background image
P/N 13772-151 19 of 52
Cirrus Design Section 9
SR22T Supplements
which may not be adequate to wet-out the entire panel if the
Pre-Flight Inspection is performed at warmer temperatures.
Increasing the system flow rate (MAX vs. HIGH or HIGH w/
PUMP BKUP vs. HIGH) will increase the arterial pressure of
the system which promotes the complete wet-out of the
porous panels.
Pre-Flight Inspection
1. Cabin
a. Circuit Breakers................................................................. SET
b. Battery 1 Master Switch ......................................................ON
c. Flaps................................................................................100%
d. Avionics Master Switch........................................................ON
e. Cabin Speaker.....................................................................ON
f. Cabin Doors ................................................................. CLOSE
g. WIND SHLD Push-Button ............................................PRESS
(1) Verify evidence of deicing fluid from spray nozzles.
h. PUMP BKUP Switch............................................................ON
(1) Metering Pump Duty Cycle ...........Verify Continuously ON
(2) Deicing Fluid and Endurance Indications.............. CHECK
i. PUMP BKUP Switch..........................................................OFF
j. ICE PROTECT System Switch............................................ON
k. ICE PROTECT Mode Switch......................................... NORM
(1) Metering Pump Duty Cycle ..........Verify 30s ON, 90s OFF
(2) Deicing Fluid and Endurance Indications.............. CHECK
l. ICE PROTECT Mode Switch........................................... HIGH
(1) Metering Pump Duty Cycle ...........Verify Continuously ON
(2) Deicing Fluid and Endurance Indications.............. CHECK
m. ICE Inspection Lights Switch...............................................ON
(1) Verify LH and RH Operation.
Continued on following page.
Original Issue: 02-01-13

Table of Contents

Other manuals for Cirrus SR22T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cirrus SR22T and is the answer not in the manual?

Cirrus SR22T Specifications

General IconGeneral
ManufacturerCirrus Aircraft
EngineContinental TSIO-550-K
Horsepower315 hp
Max Takeoff Weight3, 600 lbs
Service Ceiling25, 000 ft
Cabin Width49 in
Cabin Height50 in
Seating Capacity4
AvionicsCirrus Perspective+ by Garmin
CategorySingle-engine piston aircraft
PropellerHartzell 3-blade composite
Wingspan38 ft 4 in
Length26 ft
Height8 ft 11 in
Maximum Cruise Speed213 KTAS
Fuel Capacity92 gallons
Stall Speed64 knots
Safety FeaturesCirrus Airframe Parachute System (CAPS)
Cruise Speed183 knots

Related product manuals