EasyManuals Logo
Home>Cisco>Server>UCS C210

Cisco UCS C210 User Manual

Cisco UCS C210
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #45 background imageLoading...
Page #45 background image
3-7
Cisco UCS C210 Server Installation and Service Guide
OL-20887-02
Chapter
Preparing for Component Installation
This section describes how to prepare the server for component installation or replacement and includes the
following topics:
Required Equipment, page 3-7
Shutting Down and Powering Off the Server, page 3-8
Removing and Replacing the Server in a Rack, page 3-9
Removing and Replacing the Server Top Cover, page 3-10
Removing and Replacing the Server Front Cover, page 3-11
Replaceable Component Locations, page 3-12
Warning
Only trained and qualified personnel must be allowed to install, replace, or service this equipment.
Statement 1030
Warning
This unit might have more than one power cord. To reduce the risk of electric shock, disconnect the
two power supply cords before servicing the unit.
Statement 14
Required Equipment
The following items are used to perform the procedures in this chapter:
Number 1 Phillips-head screwdriver
Number 2 Phillips-head screwdriver
Needle-nose pliers
Electrostatic discharge (ESD) strap or other grounding equipment such as a grounded mat.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco UCS C210 and is the answer not in the manual?

Cisco UCS C210 Specifications

General IconGeneral
BrandCisco
ModelUCS C210
CategoryServer
LanguageEnglish

Related product manuals