EasyManua.ls Logo

Cisco UCS C210 - Preparing for Component Installation; Required Equipment

Cisco UCS C210
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-7
Cisco UCS C210 Server Installation and Service Guide
OL-20887-02
Chapter
Preparing for Component Installation
This section describes how to prepare the server for component installation or replacement and includes the
following topics:
Required Equipment, page 3-7
Shutting Down and Powering Off the Server, page 3-8
Removing and Replacing the Server in a Rack, page 3-9
Removing and Replacing the Server Top Cover, page 3-10
Removing and Replacing the Server Front Cover, page 3-11
Replaceable Component Locations, page 3-12
Warning
Only trained and qualified personnel must be allowed to install, replace, or service this equipment.
Statement 1030
Warning
This unit might have more than one power cord. To reduce the risk of electric shock, disconnect the
two power supply cords before servicing the unit.
Statement 14
Required Equipment
The following items are used to perform the procedures in this chapter:
Number 1 Phillips-head screwdriver
Number 2 Phillips-head screwdriver
Needle-nose pliers
Electrostatic discharge (ESD) strap or other grounding equipment such as a grounded mat.

Table of Contents

Related product manuals