EasyManua.ls Logo

CLIVET WSAN-XIN 21 - Unit Start-Up Procedure

CLIVET WSAN-XIN 21
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
If present
6 - START-UP
Start-up sequence - Unit ON power supply
Compressor carter resistances operating at least since 8 hours
Off-load voltage measure
Phase sequence check (unit only 400/3/50)
Unit ON
Load voltage measure and absorptions
Check of all fan operating
Measure of return and supply water temperature and flow valutation
Super-heating and sub-cooling measure and discharge temperature
Check no anomalous vibrations are present
Set-point personalization
Impostare data e ora
Personalise scheduling
Personalise DHW *
Climatic curve personalization
Complete and available unit documentation
Set ambient keypad *
START-UP SEQUENCE
Operations to perform to start-up the unit.
For details refer to the different manual sections.
*

Related product manuals