MAN.219 Rev.8 ENG - Use and maintenance manual S19N page 57 of 71
11 Overload tests
During the commissioning of the machine, in the final test, we
carried out the following overload tests. During the same, we
tested S19N stability and structural resistance.
Overload tests shall be carried out only on the first test of the ma-
chine: these tests are unique. In no other occasion shall you carry
out tests with the same loads used in the overload tests.
Overload tests
Test
nr.
Load
(Kg)
Booms position
Movement
Notes
Radius
(m)
Boom
Panto-
graph
1
230 (PN)
+
120 (CP)
7,30
horizon-
tal
completely
lifted
Lateral left
OK
2
120 (PN)
+
70 (CP)
8,50
horizon-
tal
completely
lifted
Lateral
right
OK
NOTES.
PN: nominal capacity.
CP: test load.