MAN.219 Rev.8 ENG - Use and maintenance manual S19N page 58 of 71
12 Operating tests
During the commissioning of the machine, we carried out the
following final operating tests. We have tested the correct op-
eration of the S19N and of its safety systems.
Test description
Outcome
Block of the maneuver in case of release of the opera-
tion lever selected.
OK
Basket levelling only allowed when the aerial part of the
MEWP is in rest position (pantograph and telescopic
boom on its support).
OK
Manual pump for recovery maneuvers in case of emer-
gency.
OK
Outriggers-boom operation interlock.
OK
Block of the maneuvers of the aerial part of the MEWP
when this is not stabilized.
OK
Block of stabilizers return/extraction when the aerial part
is not in rest position.
OK
Warning light for machine stabilization.
OK
Warning light for electrical supply of the MEWP.
OK
Warning light for travel consent.
OK
Emergency buttons in the control stations.
OK
Lock valves on the cylinders.
OK
Pressure relief valve for the protection of the entire hy-
draulic circuit.
OK
Pressure relief valves for the protection of the individual
parts of the system.
OK
Fuse for the protection of the electrical system.
OK
Moment limiting device
OK
Load limiting device*
OK
Electropump*
OK