MAN.219 Rev.8 ENG - Use and maintenance manual S19N page 7 of 71
1.3 CE certification
C.M.C. s.r.l. states under its own responsibility that S19N was designed and
produced in compliance with national and European standards, and that
the machine is identical to the model submitted to control and test for the
CE certification” by the Notified Institute nr. 1878 - VERICERT s.r.l. - via
L. Masotti, 5 48124 Ravenna Italy.
1.4 TÜV certification
C.M.C. s.r.l. states under its own responsibility that S19N was designed and
produced in compliance with US standards ANSI/SAIA A92.20:2020 and
that the machine is identical to the model submitted to control and test for
the “TÜV certification” by TÜV SÜD America Inc.
TÜV SUD America Inc. is an OSHA recognized NRTL and a Standards
Council of Canada accredited certification body.
1.5 Classification
The mobile elevating work platform (MEWP) S19N belongs to group B: the
vertical projection of the center of the area of the MEWP in different plat-
form configurations specified by the manufacturer can be outside the tip-
ping lines (EN 280 par. 1.4 - ANSI/SAIA A92.20 par. 3).
As for the displacement, it belongs to type 1: travelling is only allowed with
the MEWP in its transport configuration or in the stowed position (EN 280
par. 1.4 - ANSI/SAIA A92.20 par. 3).
1.6 Loading cycles
The machine is expected to live for 40.000 working cycles
1
(i.e. 10 years,
40 weeks per year, 20 hours per week, 5 cycles per hour).
Within this term, the machine must undergo at least 2 (two) in-depth
checks (structural, mechanical, electric, elements, etc.), in case of heavy
uses (frequent use at the performance limit, unfavorable environmental
conditions such as steel systems, paper mills and so on) it is better to in-
crease the checks. Anyway, it is advisable to have the state of the
machine checked by the manufacturer factory or by an authorized
assistance point, at least every 1500 2000 working hours or once a
year.
1
Loading cycle: cycle starts from the access position, continues performing the
work and finishes returning to the access position.