IMPORTANT
Failure to closely follow set-up, operational and maintenance procedures
may result in damage to the unit and/or void your warranty. Coldelite
Corporation will not be responsible for any machine not properly main-
tained.
In the event this unit should malfunction, please contact your Coldelite
Distributor or authorized service agency.
PART
1
INSTALLATI0
N
Before starting this procedure, make certain the shipping case does not
show any evidence of having been dropped, tampered with or abused in
such a way as to indicate that its contents may have been damaged in
transit.
IMPORTANT: Should the outside of the shipping case give any indication
of possible hidden damage, state this on the bill of lading before signing.
Contact the carrier immediately and request an inspection of the damage.
If this procedure
is
not adhered to, you will forfeit your right to file a
damage claim and be responsible for subsequent repair costs.
A) UNCRATINC
Proceed as follows:
1.
Remove tho machine from its carton and remove all protective crating
material.
2.
Remove the single screw at the bottom of each side panel,
Remove
the side panels by pulling in a downward and outward direction, allowing
the panel to slide free, The protective plastic coating which is laminated
to the panels czn now be removed by simply peeling off.
8)
POSITIONING
THE
MACHINE
1.
The machine
is
now ready to be positioned onto your counter. The counter
must be capable of supporting
225
Ibs., and should be vibration free, Rein-
force
it
if necessary. Remember, when choosing a location, your unit
is air cooled, proper air flow
will
need to be maintained. Allow at least
six
(6)
inches on either side and a minimum of twelve
(1
2)
inches between
the rear of the machine and any obstruction. (Ref. Fig,
1)
PACE
1