17:
Flow
I
I
I
Side
View
La-1
00B
Front
View
LB-1008
FIGURE
1
Clearances Required
For
Proper Air Cooling
NOTE:
If
these clearances are not maintained, tile production capacity
will
be
reduced, cycling will increase and the potential exists that the
"
-
machine will stop immediately.
2,
The machine should be within four feet of the power supply outlet,
3-
Position the machine
for
easy accessibility when cleaning, servicing
and performing routine maintenance,
4-
2osition the machine away from direct sunlight. for every
2
OF
above
68
F,
the mschine's performance
will
decrease
by
approximately
1
%-
5-
Once the machine is set in position,
it
should be le?re!ed as accurately
as possible-
C) ELECTRICAL REQUIREMENTS
A11
wiring
installed to operate this freezer must be in accordtnce \vith
the National Electrical Code and/or local e1ec;rical codes, rules and
regulations.
The
machine must be properly grounded.
It
is recommended
the power supply be installed by a licensed electrician.
VOLTAGE
LB-1008:
1
15
Volts
RUNNING AMPERAGE
FLA:
27.0
FUSE
SIZE:
32
AMP
~Uax.
WIRE
SIZE:
(50
Fi. 1tlax.1
$10
POWER
SUPPLY
must 5e adequate to meet
requirements
at all times,
V01i~ce f!uc;uations,
with
ihe machice in operation, should nor exczed
=
1
O~~OF
the normal or rated voltace-
PACE
2