Inteli NT GeCon MINT, SW Version 1.4, ©ComAp – June 2007
IGS-NT-GeCon-MINT-1.4.PDF
10
Running hours balancing
The gen-sets priorities are automatically swapped to balance engine running hours. Up to 32 controllers are
supported.
Activation: #PriorAutoSwap = RUN HOURS EQU
Important setpoints: RunHoursBase , #RunHrsMaxDiff
Different sized engines (Load demand) swap
Three running engines (priorities) are swapped based on load demand (one “small” engine runs on “small”
load and swaps to another one “big” engine that runs when load increases).
Activation: #PriorAutoSwap = LD DEMAND SWAP
Important setpoints: #PwrBandContr1, #PwrBandContr2, #PwrBandContr3, #PwrBandContr4,
#PwrBandChngDe.