EasyManua.ls Logo

COMBA mBDA OD Series - GOODS INWARDS INSPECTION; TOOLS; PREPARATION

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION GUIDE FOR mBDA OD SERIES
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 19
3.3 INSTALLATION PROCEDURES
3.3.1 GOODS INWARDS INSPECTION
Verify the number of packages received against the packing list.
Check all packages for external damage; report any external damage to the shipping courier. If there
is damage, a shipping agent should be present before unpacking and inspecting the contents because
damage during transit is the responsibility of the agent.
Open and check each package against the packing list. If any items are missing, contact Comba.
Do not remove items from anti-static packing until ready for installation. If damage is discovered at the
time of installation, contact the shipping agent.
3.3.2 TOOLS
See Appendix A for a full list of the recommended tools required for installation and routine maintenance.
3.3.3 PREPARATION
Wall mounting with the masonry bolts supplied, which make use of the outer holes.
Figure 7: Mounting Rack Overview

Related product manuals