INSTALLATION GUIDE FOR mBDA OD SERIES
Copyright - refer to title page
3.4.7 BACK-UP MONITORING LI-ION BATTERY CONNECTION
Li-ion battery is installed in Li-ion battery box before delivery. Connect battery cable in operation window
after finishing commissioning. The alarm information will be reported in case of power fault.
Figure 21: Battery Connection in Operation Window
3.4.8 PHYSICAL CONNECTION TO OMT PC
For local commissioning, there is the method to connect the equipment with OMT PC.
Wireless Network/
Ethernet
Wireless
Build-in
WCDMA
Modern
/Ethernet
Adaptor
Realize Remote
Monitoring
Local Monitoring
Wireless
Modem/Ethernet
Monitoring Center
RJ45 Cable
Figure 22: OMT Connection without Chassis Open
Note: After connection and commissioning, please make sure the water proof for all external
connectors.
End of Section