EasyManua.ls Logo

COMBA mBDA OD Series - Back-Up Monitoring Li-Ion Battery Connection; Physical Connection to Omt Pc

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION GUIDE FOR mBDA OD SERIES
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 28
3.4.7 BACK-UP MONITORING LI-ION BATTERY CONNECTION
Li-ion battery is installed in Li-ion battery box before delivery. Connect battery cable in operation window
after finishing commissioning. The alarm information will be reported in case of power fault.
Figure 21: Battery Connection in Operation Window
3.4.8 PHYSICAL CONNECTION TO OMT PC
For local commissioning, there is the method to connect the equipment with OMT PC.
Wireless Network/
Ethernet
Wireless
Build-in
WCDMA
Modern
/Ethernet
Adaptor
Realize Remote
Monitoring
Local Monitoring
Wireless
Modem/Ethernet
Monitoring Center
RJ45 Cable
Figure 22: OMT Connection without Chassis Open
Note: After connection and commissioning, please make sure the water proof for all external
connectors.
End of Section

Related product manuals