EasyManua.ls Logo

CommScope Touchstone TG6452 - Chapter 3: Installation and Connection; Pre-Installation Checklist; Front Panel Indicator Lights

CommScope Touchstone TG6452
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3
Install and connect your Telephony
Gateway
Before you start, make sure that:
You have contacted your service provider and veried that they provide data and
telephone service using standard DOCSIS technology.
You have all the Items you need (page 11).
Cable, phone, and power outlets are available near the computer. If a cable outlet is not
conveniently located, your service provider can install a new one.
If you have ordered service, your service provider should congure the Telephony Gateway
automacally. You need only follow the instrucons in this secon to install and connect the
Telephony Gateway.
CAUTION:
Risk of equipment damage.
Only qualied installaon technicians should connect the Telephony Gateway to
house wiring. Incumbent telephone service must be physically disconnected at the
outside interface box before making any connecons.
Front panel
The front of the TG6452 has the following indicators.
Touchstone TG6452 Telephony Gateway User Guide DRAFT Revision 2.3 18

Table of Contents

Related product manuals